28,000+ Man Hours with ZERO safety incidents

Eight Month Project duration

This project involved a complex relocation of two pipelines by opencut and HDD. The work was carried on through a brutal Chicago winter and despite the weather, stayed on schedule without compromising safety. (Case study at 7000 ft. Relocation).

Work tasks included:

  • Eight HDD shots traversing through a very tight corridor in the vicinity of active pipelines
  • Crews were challenged with unmarked, abandoned pipelines
  • No records for abandoned lines requiring extensive hydro-excavation
  • Over 5,500 linear feet of pipeline removed
  • Extensive work around wetlands
  • Drill string and valve setting fabrication and hydrostatic testing
  • Mat placement for equipment and walking
  • Working off frozen mats
  • Subcontractor tree removal/stump grinding